Each year, the Steel Bridge Team designs, fabricates, and test a scale model bridge to compete in the ASCE/AISC Student Steel Bridge Competition. The bridge must meet set specifications adjusted each year. The goal is to create a bridge that is lightweight, strong, and fast to assemble. Members of Steel Bridge have the opportunity to work on a team to develop innovative solutions to challenging engineering problems